1、Detection and Restoration of Flexural Deformation on the Lower Part of the Main Beams of Bridge Crane───桥式起重机主梁下挠变形的检验及修复
2、The main beams of the houses are formed by three tiers of poles.───房子的主梁由三层线杆构成。
3、This paper aims to evaluate the system reliability sensitivity of main beams using the adaptive importance sampling method.───介绍了自适应重要抽样方法的基本原理,定义了均值敏感性因子和标准差敏感性因子。
4、The test showed that: in each test state, the harmful vortex-induced vibration has not been found in the main beams and the bridge towers.───试验结果表明:在试验的各状态下,主梁及桥塔均未发现有害的涡激振动。
5、Most of the main beams are designed as the single section for the newly-built Bridges.───绝大多数的桥梁中主梁所采用的横截面都是相同的。
6、The suspension bracket is connected with the transmission case and the main beams.───悬挂架与变速箱及主梁相连接。
7、The calculation results show the effect of the number of main beams and the load parameters on the dynamic instability region.───计算结果显示了主向梁数目和载荷参数对动力不稳定区的影响。
main beams(英语使用场景)
1、The suspension bracket is connected with the transmission case and the main beams.
2、Between the main beams, lengths of steel decking are laid side by side, each hooking into its neighbor.
3、The calculation results show the effect of the number of main beams and the load parameters on the dynamic instability region.
4、At one curve in the road the driver stopped and flashed his main beams.
main beams(意思翻译)
主声束;主光束
main beams(相似词语短语)
1、main scene───主要景点;主场景;主体现场
2、beams global───全局光束
3、main───adj.主要的,最大的,最重要的;n.(Main)(美)梅因(人名);n.(输送水、煤气等的)总管道,主管道;(themains)(水、电等的)供应,供应XiTong;电源插座;海洋,公海;主帆(mailsail的简称);(掷骰子游戏中)叫数;斗鸡比赛
4、beams store───束存储器
5、beams synonym───梁同义词
6、beams type───梁类型
7、beams───[建]梁;n.(Beams)人名;(英)比姆斯
8、girders beams───大型工字梁;梁式桁架
9、beams login───梁登录
main beams(双语使用场景)
1、Detection and Restoration of Flexural Deformation on the Lower Part of the Main Beams of Bridge Crane───桥式起重机主梁下挠变形的检验及修复
2、The main beams of the houses are formed by three tiers of poles.───房子的主梁由三层线杆构成。
3、This paper aims to evaluate the system reliability sensitivity of main beams using the adaptive importance sampling method.───介绍了自适应重要抽样方法的基本原理,定义了均值敏感性因子和标准差敏感性因子。
4、The test showed that: in each test state, the harmful vortex-induced vibration has not been found in the main beams and the bridge towers.───试验结果表明:在试验的各状态下,主梁及桥塔均未发现有害的涡激振动。
5、Most of the main beams are designed as the single section for the newly-built Bridges.───绝大多数的桥梁中主梁所采用的横截面都是相同的。
6、The suspension bracket is connected with the transmission case and the main beams.───悬挂架与变速箱及主梁相连接。
7、The calculation results show the effect of the number of main beams and the load parameters on the dynamic instability region.───计算结果显示了主向梁数目和载荷参数对动力不稳定区的影响。
main beams(英语使用场景)
1、The suspension bracket is connected with the transmission case and the main beams.
2、Between the main beams, lengths of steel decking are laid side by side, each hooking into its neighbor.
3、The calculation results show the effect of the number of main beams and the load parameters on the dynamic instability region.
4、At one curve in the road the driver stopped and flashed his main beams.